|
This SlideShowPro photo gallery requires the Flash Player plugin and a web browser with JavaScript enabled.
Project Name: UAB Heritage Hall
Project Location: Birmingham, Alabama
Owner/Client: University of Alabama at Birmingham (UAB)
Architect(s) of Record:
KPS Group, Inc.
2101 First Avenue North
Birmingham, Alabama 35203
Project Team:
Hugh B. Thornton, AIA, LEED AP, Principal-in-Charge
Donald Simpson, AIA, LEED AP, Project Manager
Susan K. Lineberry, AIA, LEED AP, Project Architect
Maria Casey, IIDA, LEED CI, Senior Interior Designer
Landscape Architect: KPS Group, Inc.
Consultants:
Goody Clancy—Education Planning Architect
CRS Engineering, Inc.—MEP/FP and Lighting Design
LBYD, Inc.—Structural Engineering
Walter Schoel Engineering Company, Inc.—Civil Engineering
Boyken International, Inc.—Cost Consulting
General Contractor: Hoar Construction, LLC
Photographer(s):
Thomas Watkins Photography: Slides 5—11
|